| Project Name |
Matthew B. Wallace Transportation Center |
Project Description |
| Project Location |
Las Vegas, NV |
This project includes a new 20,000 sf administrative office building, a new 40,000 sf maintenance building, a fueling island, and a bus wash facility. Construction consists of concrete foundations and slabs, tilt-up concrete walls, steel joists and roof deck, and a built-up roofing system. The project includes a full complement of vehicle lifts and maintenance equipment. The project also includes extensive development of the 40-acre site for bus parking and storm drainage. |
| Project Role |
Prime Contractor |
| Project Cost |
Coming Soon... |
 |
|
|
|
|
| Project Name |
UNLV Science Engineering and Technology Building |
Project Description |
|
| Project Location |
Las Vegas, NV |
This facility is 190,000 sf structure features easily converted lab space to increase flexibility, with large fixed elements, sinks, ducts, and pipes located along the exterior wall, interior corridors and in corners. The four story structure creates lecture and laboratory spaces that are less defined by discipline and are versatile and encourage interaction. This facility is being constructed to LEED Certified status. |
| Project Role |
Prime Contractor |
| Project Cost |
$70,400,000.00 |
|
|
|
|
| Project Name |
Northwest Career & Technical Center High Schoo |
Project Description |
|
| Project Location |
Las Vegas, NV |
Coming Soon... |
| Project Role |
Prime Contractor |
| Project Cost |
Coming Soon... |
|
|
|
|
| Project Name |
McCarran International Airport – Bus Maintenance Facility |
Project Description |
|
| Project Location |
Las Vegas, NV |
Coming Soon... |
| Project Role |
Prime Contractor |
| Project Cost |
Coming Soon... |
|
|
|
|
| Project Name |
Rawson-Neal Psychiatric Hospital |
Project Description |
|
| Project Location |
Las Vegas, NV |
Coming Soon... |
| Project Role |
Prime Contractor |
| Project Cost |
Coming Soon... |
|
|
|
|
| Project Name |
Andre Agassi College Preparatory Academy High School & Gym |
Project Description |
|
| Project Location |
Las Vegas, NV |
Coming Soon... |
| Project Role |
Prime Contractor |
| Project Cost |
Coming Soon... |
|
|
|
|
| Project Name |
Stephens Performing Arts Center – Phase I |
Project Description |
|
| Project Location |
Pocatello, ID |
A 122,000 square foot state of the art performing arts center consisting of a large concert hall, a smaller thrust theater, and an intimate studio theater. Construction consists of structural steel with masonry infill panels; brick, precast, and GFRC veneer; floors consists of slab on grade, slab on deck, and structural cast in place slab construction; interior finishes included masonry and stud and drywall partitions, and GRG panels. |
| Project Role |
General Contractor |
| Project Cost |
$23,805,000 |
 |
|
|
|
|
| Project Name |
Stephens Performing Arts Center – Phase II Concert Hall |
Project Description |
|
| Project Location |
Pocatello, ID |
Project consisted of the interior finishes for the Concert Hall of this building. This included the interior GRG skin, stage rigging, fire protection sprinklers, mechanical and electrical services, AV systems, theatrical lighting systems, seating, and flooring. During the preconstruction phase of the project we provided constructability feedback, put together the bid packages for contractors bidding, received and reviewed contractor bids, make award recommendations to the owner, and processed the contractor contracts. As the Construction Manager we provided most of the Division 1 general conditions for the project, monitoring schedule and cost changes, and providing day to day coordination for the contractors. As the CM, we were not allowed by Idaho State law to self perform any of the work. |
| Project Role |
General Contractor |
| Project Cost |
$5,500,000.00 |
 |
|
|
|
|
| Project Name |
ISU Classroom Multi-use Complex |
Project Description |
|
| Project Location |
Pocatello, ID |
Work performed included cast in place structural concrete for four levels and a roof deck of a 47,000 square foot dormitory structure. |
| Project Role |
General Contractor |
| Project Cost |
$5,200,000.00 |
 |
|
|
|
|
| Project Name |
Hayes Shelter Home for the Idaho Youth Ranch |
Project Description |
|
| Project Location |
Boise, Idaho |
Sletten Construction donated construction management services to the Idaho Youth Ranch to help build a 7,400 square foot, 20 bed group home and a freestanding garage that was designed with the influence of a mountain lodge. The construction consisted of concrete foundations, a wood-framed floor system, structural steel and timber columns, wood stud walls, tongue-and-groove plank roof decking, cement board siding, and metal roofing. |
| Project Role |
General Contractor |
| Project Cost |
$1,200,000.00 |
| |
|
|
|
|
| Project Name |
City of La Grande Public Library |
Project Description |
|
| Project Location |
La Grande, OR |
This project is a new 19,000 sf single-story library. Construction consists of concrete foundation and slabs, structural steel frame with steel stud walls, tongue-and-groove plank roof decking, and a single ply membrane roof. The exterior skin utilizes many materials including cast-in-place and precast concrete, synthetic stone veneer, composite wood panels, aluminum curtain glazing, and Kalwall glazing systems. |
| Project Role |
General Contractor |
| Project Cost |
$3,485,000.00 |
 |
|
|
|
|
| Project Name |
City of Peoria Performing Arts Theater – CM@R |
Project Description |
|
| Project Location |
Phoenix, AZ |
This project will be approximately 17,000 SF under roof and house a 250 seat main stage theater with fixtures and furnishings that include audience seating, theatrical lighting, sound system, and all associated support facilities, including a public lobby, concession areas, box office, restrooms, dressing rooms, storage rooms, offices, parking, storm water retention, exterior signage and landscaping. The facility will also include and unfinished black box theater. |
| Project Role |
Construction Manager / General |
| Project Cost |
$10,956,351.00 |
 |
|
|
|
|
| Project Name |
Tucson Border Patrol Sector Headquarters |
Project Description |
|
| Project Location |
Tucson, AZ |
The facility consists of the Administration, Facilities Maintenance, Vehicle Maintenance and Detention Building, Car Wash, and both open and covered surface parking. The Sector Headquarters includes approximately 64,206 sf of office facility, 84,095 sf of industrial facility, and 1,968 sf of canopy area for a total building area of 150,269 sf. The Sector Detention Facility includes approximately 20,989 sf of built area. |
| Project Role |
General Contractor |
| Project Cost |
$ 6,639,000 |
 |
|
|
|
|
| Project Name |
Glendale Union High School District (5 Campuses) |
Project Description |
|
| Project Location |
Glendale, AZ |
letten worked on the HVAC Corrections at Moon Valley, Apollo, Glendale, Washington, and Sunnyslope High School for the Glendale Unified School District.
Glendale High School – Includes demolition as required to remove the existing and install new HVAC equipment at multiple buildings. Locations include roof top, concrete mezzanines and floor slabs at various buildings. New chilled water lines and trenching.
Sunnyslope High School – Includes demolition as required to remove the existing evaporative cooler units and supporting ductwork. Installation of new fan coil units, chilled water lines and new ductwork. Ceiling areas removed and replaces.
Washington High School – Includes demolition as required to remove existing evaporative cooler units and supporting ductwork. Installation of new roof top units, chilled water lines and new ductwork. Demolition to remove the existing and install new HVAC equipment at multiple buildings. Locations include roof top, concrete mezzanines and floor slabs at various buildings.
Moon Valley High School – Includes demolition as required to remove the existing and install new HVAC equipment at multiple buildings. Locations include roof top, concrete mezzanines and floor slabs at various buildings. New chilled water lines and trenching as indicated. Demolition as required to remove the existing evaporative cooler units and supporting ductwork. Installation of new roof top units, chilled water lines and new ductwork. Ceiling area removed and replaces.
Apollo High School – Includes demolition as required to remove the existing evaporative cooler units and supporting ductwork. Installation of new roof top units, chilled water lines and new ductwork. Ceiling areas removed and replaces. |
| Project Role |
General Contractor |
| Project Cost |
$5,833,000 |
| |
|
|
|
|
| Project Name |
Benefis Healthcare Heart Institute Patient Tower |
Project Description |
|
| Project Location |
Great Falls, MT |
This project is a 6 story patient tower with a penthouse, 204,000 total square footage. It will include administrative offices, OR surgery, labs, clinical support, patient rooms, NICU, pediatrics, and a birthing unit. There will be a two story serpentine concourse leading from the tower to the main hospital entrance. A new auditorium will be added and the existing cafeteria will be enlarged. A preliminary contract budget is $47 million.
Construction will be cast in place concrete frame, pan slabs, founded on drilled piers for the main tower. A steel frame tower will connect the reception areas with the patient tower. Exterior metal wall panels with curtain wall system will envelope the structure. Two public elevators and two service elevators will provide vertical access. Mechanical systems will encompass HVAC, plumbing, medical gases, oxygen and fire sprinklers. Electrical systems will include emergency power distribution, fire alarm, nurse call stations, and voice / data system. |
| Project Role |
General Contractor |
| Project Cost |
$47,000,000.00 |
| |
|
|
|